Hybrid System is constructed in 2023-2024, with a total installed capacity of 10 MW for diesel generator and 2 MW for solar with 1MW battery storage and actual available capacity 10 MW as estimated.

Hybrid System is constructed in 2023-2024, with a total installed capacity of 10 MW for diesel generator and 2 MW for solar with 1MW battery storage and actual available capacity 10 MW as estimated.
188
Copyright 2025 Mogadishu Power Supply. All rights reserved.